Bookmarks for Rudiger SCHMIDT
-
Electrical quality assurance graphs:
http://cern.ch/test-elqa/
Logging Timber and Meter
SPS-CNGS
Interlocks:
https://webh06.cern.ch/sps-mp-operation/
JIRA MP
ADAMS Access
System
HC
Coordination Meetings 2009 INDICO
MPP and nMPP
and MP3
MP
modifications in SharePoint
Meeting MPE
in INDICO
Cryostats and Interconnects
LHC
Machine Committee LMC
LHC
Operations Committee
LHC Coordination
LHC
MD Coordination
LHC Operation Sharepoint
Elogbook
Electrical
Task Force
Link to page with FILL NUMBERS
Link to ATLAS page
Link to LHC statistics WEB page
Vistar 1
Vistar 3
SharePoint Hardware Commissioning
SharePoint-ITER
List of quenches
Link to ATLAS Statistic page
MPE-PE beam
impact page
Hardware
commissioning: Specifications
LHC-CI-TP-0001:
The Commissioning of the Hardware in The LHC Sectors: Individual System
Tests of the Powering Interlock Controller
LHC-R-HCP-0001 v.1.4:
The Commissioning of the Hardware in the LHC
Sectors: the Power Converters Connected to the DC Cables in Short Circuit
LHC-D-HCP-0002 rev 1.0: The Commissioning of
the Hardware in the LHC Sectors: Interlock Tests of
Powering Subsector Prior & After Connection of the Power Cables to DFB Leads
LHC-D-HCP-0003 v.1.0:
The Commissioning of the Hardware in The LHC Sectors:
Powering of the Superconducting Circuits of a Sector up to Nominal Current
LHC-D-HCP-0005 v.1.0: PROCEDURES
FOR THE SHORT CIRCUIT TESTS OF POWER CONVERTERS AND AUTOMATED COMMISSIONING
OF INTERLOCKS FOR ELECTRICAL CIRCUITS OF THE LHC
LHC-D-HCP-0004 v.1.0: The
Commissioning of the Hardware in the LHC Sectors : The Commissioning of the
Inner Triplet Region
LHC-R-HCP-0002 v.1.0 COMMISSIONING THE POWER
CONVERTERS OF THE MATCHING SECTION AND DISPERSION SUPPRESSOR QUADRUPOLES
WITH OPTICS FUNCTIONS
LHC-D-HCP-0010 rev 0.1: Powering
Strategies for the Commissioning of the Superconducting Circuits in Sectors
7-8 and 8-1
LHC-Q-ES-0003 v.0.3: The Process of the
Cryogenic System for LHC Functional Analysis
LHC-MPP-HCP-0089
(version 0.2), "MP3 PROCEDURE -
CLASSIFICATION OF 600A CIRCUITS ACCORDING TO THEIR COMMISSIONING STATUS AND
MAINTENANCE ACTIVITY"
LHC-MPP-HCP-0003 ver.2.0 Released, "TEST
PROCEDURE AND ACCEPTANCE CRITERIA FOR THE 600 A CIRCUITS"
LHC-MPP-HCP-0006
ver.2.0 Released, "TEST PROCEDURE AND
ACCEPTANCE CRITERIA FOR THE 60 A CIRCUITS"
LHC-MPP-HCP-0005 ver.2.0 Released, "TEST
PROCEDURE AND ACCEPTANCE CRITERIA FOR THE 80 A AND 120 A DIPOLE CORRECTOR
CIRCUITS"
LHC-MPP-HCP-0040 ver.1.1, EDMS Id:
883231, SECTOR 2-3
POWERING SPECIFICITIES
CPA congress
Movie Atlas
Movie Injection
Movie
Dipole
Movie
HammerWerfer
Movie
CERN_Intro
Movie
Collisions
CPA-20100928
Other links
Restaurants
Wein